International News

UK News

Reference Sites

PR

SE Controls starts the countdown to BAU 2017

SE Controls will be exhibiting at the BAU exhibition in Munich from the 16th to the 21st January in hall B2.534.

New ventilation and smoke control BIM objects from SE Controls

BIM available from ventilation specialists SE Controls

Laptop showing smoke ventilation in action SE Controls have developed SHEVTEC® to offer a complete solution which complies with building regulations and fire engineered solutions.
Find out more

Laptop showing natural ventilation in action SE Controls Natural Ventilation Solution division (NVS) provides total, adaptive and tailored natural ventilation strategies for all types of new and refurbished building structures.
Find out more

Go back

Smoke Ventilation for the Fastest Train Station, in China

03 February 2010

News article image for Smoke Ventilation for the Fastest Train Station, in  China
Project: Wuhan Railway Station

Location: Wuhan, China

Architect: AREP (Paris)

Solution: Natural Smoke Ventilation System

Wuhan Railway Station, the railway hub for the fastest train in China, started operations on the 26th December 2009 which marked a new era in railway transportation in China, achieved an average speed of 300 km per hour.
The station is designed by AREP (Paris), Fourth Survey and Design Institute of China (Wuhan) MaP3 (structural engineer - Paris), after winning a 2 phases competition in 2005. The general shape and master plan is inspired by the yellow crane, symbol of Wuhan City. The roof is like the wings of the bird.

The Wuhan Railway Station has 11 platforms, a total of 20 track, including the four lines and are made to line 16. The total construction area of the station is 370,860 square meters, of which the station building has a 114,602 square meters floor area, elevated pedestrian station platform before 13,324 square meters, non-stop pillar Canopy 143,664 square meters, ground floor of 60,650 square metres pedestrian access, ground floor car park 38620 square meters.

SE Controls has been chosen because of there vast experience in serving infrastructural projects including Airport Express Terminal of Hong Kong International Airport and Beijing International Airport Phase II. There are 780 double action pneumatic actuators with interlocking mechanism, and 25 OS2 controllers were installed on site to activate 360 bottom hung smoke vents to protect lives in case of fire.

Go back

News

SE Controls starts the countdown to BAU 2017

SE Controls will be exhibiting at the BAU exhibition in Munich from the 16th to the 21st January in hall B2.534.

New ventilation and smoke control BIM objects from SE Controls

BIM available from ventilation specialists SE Controls

NBS Plus

NBS Plus logo SE Controls listed within NBS Plus

SE Controls products are now listed within NBS Plus, part of the NBS industry standard specification software.

Find out more

Videos

Video Playback Unavailable

SE Controls Core Competencies

View More

Sign up for our Newsletter

Contact Details

Lancaster House, Wellington Crescent, Fradley Park, Lichfield, Staffs, UK, WS13 8RZ
Tel: 44+ (0) 1543 44 30 60
Fax: 44+ (0) 1543 44 30 70
Email: info@secontrols.com